File #: 2020-156    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/30/2020 In control: Board of Directors
On agenda: 5/27/2020 Final action: 5/27/2020
Title: Proposed Amendment No. 2 GLWA-CS-152 Route Alternatives Analysis and Preliminary Design for Water Works Park to Northeast Transmission Main CIP# 122003
Sponsors: Cheryl Porter, Grant Gartrell
Indexes: Water Operations
Title
Proposed Amendment No. 2
GLWA-CS-152
Route Alternatives Analysis and Preliminary Design for Water Works Park to Northeast Transmission Main
CIP# 122003

Body
Agenda of: May 27, 2020
Item No.: 2020-156
Amount: Original Contract $2,813,216.63
Amendment No. 1 1,579,342.00
Proposed Amendment No. 2 0.00
Total Contract $4,392,558.63

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Sue F. McCormick
Chief Executive Officer
Great Lakes Water Authority

DATE: May 1, 2020

RE: Proposed Amendment No. 2
Contract No. GLWA-CS-152
Route Alternatives Analysis and Preliminary Design for Water
Works Park to Northeast Transmission Main
Vendor: Jacobs Consultant, Inc.


MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CS-152 Proposed Amendment No. 2, "Route Alternatives Analysis and Preliminary Design for Water Works Park to Northeast Transmission Main" with Jacobs Consulting, Inc., with no increase in cost for a total cost of $4,392,558.63, and an increase in duration of 765 days for a total contract duration of 1,819 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
The original scope of work for the CS-152 consultant services contract included route alternatives analysis and preliminary design for Water Works Park to Northeast Transmission Main project. In order to meet the Drinking Water Revolving Fund (DWRF) loan schedule, GLWA approved Amendment No. 1 to the CS-152 project. Amendment No. 1 included assistance from Jacobs Engineering to prepare design-build bidding documents and design build oversight for phase 1 of Water Works Park to Northeast Transmission Main project, which includes the Northeast Flow Control Facili...