File #: 2026-128    Version: 1 Name:
Type: Resolution Status: New Business
File created: 3/27/2026 In control: Operations and Resources Committee
On agenda: 4/8/2026 Final action:
Title: Proposed Amendment No. 7 Contract No. 1903601/SCN-0000356 Yard Piping Engineering Services CIP #216006/BCE: 79.00
Sponsors: Navid Mehram
Indexes: Wastewater Operations
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title
Proposed Amendment No. 7
Contract No. 1903601/SCN-0000356
Yard Piping Engineering Services
CIP #216006/BCE: 79.00

Body
Agenda of: April 22, 2026
Item No.: 2026-128
Amount: Original Contract $1,647,814.74
Amendment No. 1 434,722.00
Amendment No. 2 765,627.00
Amendment No. 3 0.00
Amendment No. 4 764,635.08
Amendment No. 5 1,332,739.08
Amendment No. 6 619,202.83
Proposed Amendment No. 7 0.00
Contract Amount $5,564,740.73

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority

DATE: March 27, 2026

RE: Proposed Amendment No. 7
Contract No. 1903601/SCN-0000356
Yard Piping Engineering Services
Vendor: CDM Smith Michigan, Inc.
Status: Amendment/Change Order

MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1903601/SCN-0000356, Proposed Amendment No. 7 "Yard Piping Engineering Services", with CDM Smith Michigan, Inc., with no increase in cost for a cost not to exceed $5,564,740.73 and an increase in duration of 238 days for a total duration of 2,195 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
GLWA awarded Contract No.1903601 "Yard Piping Engineering Services" to CDM Smith Michigan, Inc. (Engineer). The Contract is divided into four (4) major phases: study, preliminary design, final design, and construction.
To date, six (6) amendments have been issued. The purpose of this contract is to provide design services to support the Construction Manager at Risk (CMAR) project which is structured to advance the work through different delivery packages issued via Amendments. This ...