Title
Proposed Change Order No. 7
Contract No. GLWA-CS-060/SCN-0000212
Study/Design of the Upgraded Sludge Conveyance System and Lighting Improvements at the Detroit Wastewater Treatment Plant
CIP #213007/BCE Score: 96.20
Body
Agenda of: January 28, 2026
Item No.: 2025-426
Amount: Original contract $1,990,000.00
Change Order No. 1 96,404.00
Change Order No. 2 0.00
Change Order No. 3 0.00
Change Order No. 4 0.00
Change Order No. 5 0.00
Change Order No. 6 0.00
Proposed Change Order No. 7 0.00
Total Contract Amount $2,086,404.00
TO: The Honorable
Board of Directors
Great Lakes Water Authority
FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority
DATE: December 29, 2025
RE: Proposed Change Order No. 7
Contract No. GLWA-CS-060/SCN-0000212
Study/Design of the Upgraded Sludge Conveyance System and Lighting Improvements at the Detroit Wastewater Treatment Plant
Vendor: Black & Veatch Ltd. Of Michigan
Status: Amendment/Change Order
MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CS-060/SCN-0000212, Proposed Change Order No. 7 "Study/Design of the Upgraded Sludge Conveyance System and Lighting Improvements at the Detroit Wastewater Treatment Plant" with Black & Veatch Ltd. Of Michigan, with no increase in cost for a total cost not to exceed $2,086,404.00 and an increased in duration of 180 days for a total duration of 3,745 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
The main objective of the Black & Veatch consultant services contract was to restore sludge conveyance capacity lost due to the March 2016 fire damage while providing...