Title
Proposed Amendment No. 2
Contract No. 2002655/SCN-00000368
Study and Design Services for Northwest Interceptor Relief Sewer to Oakwood CSO Facility
CIP #222001/BCE Score: 53.6
Body
Agenda of: November 21, 2024
Item No.: 2024-387
Amount: Original Contract $5,599,456.00
Amendment No. 1 96,480.00
Proposed Amendment No. 2 7,888,013.00
Total Contract Amount $13,583,949.00
TO: The Honorable
Board of Directors
Great Lakes Water Authority
FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority
DATE: October 30, 2024
RE: Proposed Amendment No. 2
Contract No. 2002655/SCN-0000358
Study and Design Services for Northwest Interceptor Relief Sewer to Oakwood CSO Facility
Vendor: FK Engineering Associates
Status: Amendment/Change Order
MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 2002655/SCN-0000358, Proposed Amendment No. 2, "Study and Design Services for Northwest Interceptor Relief Sewer to Oakwood CSO Facility" with FK Engineering Associates, at an increased cost of $7,888,013.00 for a total cost not to exceed $13,583,949.00 and an increased duration of 901 days for a total duration of 2,787 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
FK Engineering was engaged by GLWA on March 21, 2021, to provide engineering services for the design and construction of the proposed Northwest Interceptor Relief Sewer to Oakwood CSO Facility, now known as "NOCSOS". In accordance with the original contract schedule, the study and design for the work were completed in November 2022, at which point the contract was put on hold for construction bidding. At the time the project was placed on hold, efforts related to the project during t...