File #: 2024-088    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/28/2024 In control: Board of Directors
On agenda: 3/21/2024 Final action: 3/21/2024
Title: Proposed Amendment No. 5 Contract No. 1903601 Yard Piping Engineering Services CIP #216006/BCE: 79.0
Sponsors: Navid Mehram
Indexes: Wastewater Operations

Title
Proposed Amendment No. 5
Contract No. 1903601
Yard Piping Engineering Services
CIP #216006/BCE: 79.0

Body

Agenda of: March 21, 2024
Item No.: 2024-088
Amount: Original Contract Price $1,647,814.74
Amendment No. 1 434,722.00
Amendment No. 2 765,627.00
Amendment No. 3 0.00
Amendment No. 4 764,635.08
Proposed Amendment No. 5 1,332,739.08
New Contract Total $4,945,537.90

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority

DATE: February 28, 2024

RE: Proposed Amendment No. 5
Contract No. 1903601
Yard Piping Engineering Services
Vendor: CDM Smith Michigan, Inc.

MOTION

Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1903601, Proposed Amendment No. 5, "Yard Piping Engineering Services", with CDM Smith Michigan, Inc., at an increased cost of $1,332,739.08 for a total cost not to exceed $4,945,537.90 and an increased duration of 442 days for a total duration of 1,692 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
GLWA awarded Contract No.1903601 "Yard Piping Engineering Services" to CDM Smith Michigan, Inc. (Engineer), with a start work date of December 28, 2020. The contract is mainly divided into four (4) major phases (study, preliminary design, final design, and construction). Several amendments have been issued to this project. This was anticipated based on the contracting model for this project.

This contract now has...