File #: 2023-124    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/23/2023 In control: Board of Directors
On agenda: 4/26/2023 Final action: 4/26/2023
Title: Contract No. 2101680 Lake Huron Water Treatment Plant Progressive Design Build Instrumentation Controls Improvements CIP #111006 / BCE Score: 61.00
Sponsors: Cheryl Porter
Indexes: Water Operations
Attachments: 1. 2101680 Procurement Board Report-RFP, 2. 2101680 Cost Tabulation

Title

Contract No. 2101680

Lake Huron Water Treatment Plant Progressive Design Build Instrumentation Controls Improvements

CIP #111006 / BCE Score: 61.00

Body

Agenda of:                     April 26, 2023

Item No.:                     2023-124

Amount:                     $5,125,915.00

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     March 31, 2023

 

RE:                                          Contract No. 2101680

                                          Lake Huron Water Treatment Plant Progressive Design Build Instrumentation Controls Improvements

                                          Vendor:  Brown and Caldwell Constructors

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 2101680, “Lake Huron Water Treatment Plant Progressive Design Build Instrumentation Controls Improvements” with Brown and Caldwell Constructors, at a cost not to exceed $5,125,915.00 for a duration of 2,000 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

The Lake Huron Water Treatment Plant (LHWTP) was originally constructed in 1974 with a maximum treatment capacity of 210 million gallons per day (MGD).  During the 1990s, the plant was expanded to 400 MGD.  As part of the 2015 Water Master Plan Update, LHWTP’s capacity will be aligned with the decreasing trend in water demands.  The overall firm capacity of LHWTP’s high lift pumping capacity will be modified to 380 MGD.  The plant’s firm treatment capacity is being aligned to 320 MGD. The majority of LHWTP’s flow is between 100 and 200 MGD.

Contract No. 2101680 is a progressive design build contract to affect the rehabilitation of the instrumentation and controls at the Lake Huron Water Treatment Plant. In general, this project addresses end-of-life and failing instrumentation and controls at the plant, a rebuilding of the control room, and controls improvements for the filtration system. 

JUSTIFICATION

Most of the existing control software, control, instrumentation, network, and related process equipment was installed as part of the upgrade during the 1990s, with a few version updates, and needs replacement. Filter and operation controls are in need of upgrade. The system includes a myriad of systems that are controlled by approximately ten different models of programmable logic controllers (PLCs), of which many are obsolete.

This progressive design build contract may be amended upon review and acceptance of lump sum Phase 2 proposal for construction phase services. The proposal will be prepared upon completion of the Design. GLWA may accept or reject the proposal. Upon acceptance by GLWA of the proposal, the lump sum will be set forth in a future amendment.

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.

Funding Source: Water Construction Bond

Cost Center: Water Engineering

Expense Type: Construction (5519-882111.000-616900-111006)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year

FY 2023 Planned Spend                                                                                                         $     163,000.00

FY 2024 Planned Spend                                                                                                                979,000.00

FY 2025 Planned Spend                                                                                                                976,000.00

FY 2026 Planned Spend                                                                                                             8,730,000.00

FY 2027 Planned Spend                                                                                                             9,108,000.00

FY 2028 Planned Spend                                                                                                   9,133,000.00

FY 2029 Planned Spend                                                                                                             8,036,000.00

Financial Plan Estimate                                                                                                         $37,125,000.00

Proposed Contract Award                                                                                                             5,125,915.00

Estimating Variance                                                                                                                              $31,999,085.00

FY 2023 Plan Spend per CIP                                                                                    $    163,000.00

FY 2023 Plan Spend adjusted for award value                                          $      55,000.00

FY 2023 Estimating Variance                                                                                    $    108,000.00

A budget amendment will be made to return the estimating variance for FY23 of $108,000.00 back to Capital Reserves.  The 2024-2028 CIP Draft 2 Plan document has $37,125,000.00 allocated for the proposed contract’s construction phase.  The balance of the estimating variance will be adjusted for in the future CIP Plan documents.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on April 12, 2023. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.