File #: 2021-216    Version: 1 Name:
Type: Resolution Status: Passed
File created: 6/1/2021 In control: Board of Directors
On agenda: 6/23/2021 Final action: 6/23/2021
Title: Contract No. 2004456 14 Mile Road Transmission Loop - Phase II CIP# 122013 / BCE Score: 58.4
Sponsors: Cheryl Porter, Grant Gartrell
Indexes: Water Operations
Attachments: 1. 2004456 Procurement Report, 2. 2004456 Cost Tabulation, 3. 2004456 CIP Attachment
Title
Contract No. 2004456
14 Mile Road Transmission Loop - Phase II
CIP# 122013 / BCE Score: 58.4
Body
Agenda of: June 23, 2021
Item No.: 2021-216
Amount: $92,468,705.00

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Sue F. McCormick
Chief Executive Officer
Great Lakes Water Authority

DATE: June 2, 2021

RE: Contract No. 2004456
14 Mile Road Transmission Loop - Phase II
Vendor: Ric-Man/Clark JV (Joint Venture)


MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 2004456
"14 Mile Transmission Main Loop - Phase II" with Ric-Man/Clark JV, at a cost not to exceed $92,468,705.00 for a duration of 845 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
Several of GLWA's member partners, including West Bloomfield Township, Farmington Hills, Commerce Township, Novi, Walled Lake, and Wixom are currently served drinking water through a single feed transmission main. As a result, any major breaks on this transmission main will cause loss of water service to the people, health care facilities, schools, and businesses in these communities. Therefore, the purpose of this project is to construct new transmission main and isolation valves in a looped configuration to eliminate this single feed condition that currently exists in this area of GLWA's water system. Construction of the 14 Mile Road Water Transmission System Loop is being done in two phases. Phase I is currently under construction and involves constructing approximately 1 mile of 24-inch diameter transmission main, associated gate valves, blow-offs and air valves and additional tie-ins to master meters WA-01, NV-04 and CM-01. Phase II of this project is this proposed construction contract, which will complete th...