Great Lakes Water Authority Logo
File #: 2019-362    Version: 1 Name:
Type: Resolution Status: Passed
File created: 9/30/2019 In control: Board of Directors
On agenda: 10/31/2019 Final action: 10/31/2019
Title: Contract No. 1804129 Schoolcraft Road 48 Inch Water Transmission Main CIP# 122005 / BCE 42.0
Sponsors: Cheryl Porter, Grant Gartrell
Indexes: Water Operations
Attachments: 1. 1804129 Procurement Report, 2. 1804129 Cost Summary, 3. 1804129 CIP Attachment

Title

Contract No. 1804129

Schoolcraft Road 48 Inch Water Transmission Main

CIP# 122005 / BCE 42.0

Body                     

Agenda of:                     October 31, 2019

Item No.:                     2019-362

Amount:                       $14,490,960.20

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Sue F. McCormick

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     October 2, 2019

 

RE:                                          Contract No. 1804129

                                          Schoolcraft Road 48 Inch Water Transmission Main

                                          Vendor:  Lakeshore Global

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1804129 “Schoolcraft Road 48 Inch Water Transmission Main” with Lakeshore Global, at a cost not to exceed $14,490,960.20 for a duration of 730 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

Contract No. 1804129 is a construction contract that involves constructing approximately 2.1 miles of new 48-inch diameter steel water transmission main along westbound Schoolcraft Road. This new main will replace an existing 48-inch diameter prestressed concrete embedded cylinder pipe (PCCP) located along eastbound Schoolcraft Road. This existing main is part of an older system with a history of catastrophic breaks. A portion of the new 48-inch diameter main was installed in the Interstate 96 (I-96) freeway when it was reconstructed in 2015 under the Michigan Department of Transportation (MDOT) Contract No. 82188-89095.

JUSTIFICATION

The existing 48-inch PCCP transmission main along this segment of Schoolcraft Road has had a history of breaks. The manufacturer of this transmission main segment has a documented history of failures due to hydrogen embrittlement of its prestressed steel wires. Replacing this existing PCCP water transmission main will improve water service reliability in GLWA’s system.

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.              

Funding Source: Water Construction Bond

Cost Center: Water Engineering

Expense Type: Construction (5519-882411.000-616900-122005)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year

FY 2020 Budget                                                                                             $  7,945,000.00

FY 2021 Budget                                                                                                            8,990,000.00

FY 2022 Budget                                                                                                              565,000.00

  Financial Plan Estimate                                                                        $17,500,000.00

Proposed Contract Award                                                                                    14,490,960.20

Positive Estimating Variance                                                   $  3,009,039.80

SAVINGS, COST OPTIMIZATION, AND REVENUE ENHANCEMENT IMPACT

Cost savings are not determinable at the time of award.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on October 9, 2019. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.