File #: 2019-107    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/6/2019 In control: Board of Directors
On agenda: 3/27/2019 Final action: 3/27/2019
Title: Proposed Amendment No. 1 GLWA-CS-103 Professional Engineering Services for Springwells Water Treatment Plant Low and High Lift Pumping Station Improvements CIP#/BCE Score: 114002/69.2
Sponsors: Cheryl Porter, Grant Gartrell
Indexes: Water Operations
Title
Proposed Amendment No. 1
GLWA-CS-103
Professional Engineering Services for Springwells Water Treatment Plant Low and High Lift Pumping Station Improvements
CIP#/BCE Score: 114002/69.2

Body
Agenda of: March 27, 2019
Item No.: 2019-107
Amount: Original Contract $ 9,935,926.00
Proposed Amendment No. 1 1,184,934.00
Total Revised Contract $11,120,860.00

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Sue F. McCormick
Chief Executive Officer
Great Lakes Water Authority

DATE: March 6, 2019

RE: Proposed Amendment No. 1
Contract No. GLWA-CS-103
Professional Engineering Services for Springwells Water Treatment Plant Low and High Lift Pumping Station Improvements
Vendor: CDM Smith


MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CS-103 Amendment No. 1 "Professional Engineering Services for Springwells Water Treatment Plant Low and High Lift Pumping Station Improvements" with CDM Smith, at an increased cost of $1,184,934.00 for a total not to exceed amount of $11,120,860.00 for a total contract length of 72 Months; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.

BACKGROUND
Contract CS-103 is a professional engineering services contract that includes study, design, bidding, construction administration, resident project representation, start-up, and O&M services related to major capital improvements at the Springwells Water Treatment Plant. The consultant providing services under GLWA-CS-103 is CDM Smith. The capital improvements include improvements to the existing low and high lift pumping stations, including complete replacement of the existing medium voltage electrical system supplying power to the pumping units. The base scope of services under CS-103 involves...