Great Lakes Water Authority Logo
File #: 2018-1067    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/2/2019 In control: Board of Directors
On agenda: 1/23/2019 Final action: 1/23/2019
Title: Contract No. GLWA-CS-282 Design and Construction Assistance Services for the Springwells Administrative Building, Office Build-Out, & Underground Fire Protection Loop Replacement (CIP# 114005)
Sponsors: Cheryl Porter
Indexes: Water Operations
Attachments: 1. GLWA-CS-282 Procurement Report, 2. GLWA-CS-282 Bid Tab

Title

Contract No. GLWA-CS-282

Design and Construction Assistance Services for the Springwells Administrative Building, Office Build-Out, & Underground Fire Protection Loop Replacement
(CIP# 114005)

 

Body                     

Agenda of:                     January 23, 2019

Item No.:                     2018-1067

Amount:                     $1,306,152.40

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Sue F. McCormick

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     January 3, 2019

 

RE:                                          Contract No. GLWA-CS-282

                                          Design and Construction Assistance Services for the Springwells
                                          Administrative Building, Office Build-Out, & Underground Fire
                                          Protection Loop Replacement

                                          Vendor:  WSP Michigan, Inc.

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CS-282 “Design and Construction Assistance Services for the Springwell’s Administrative Building, Office Build-Out, & Underground Fire Protection Loop Replacement” with WSP Michigan, Inc., at a cost not to exceed $1,306,152.40 for a duration of three (3) years and seven (7) months; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

The existing buried fire protection system was installed in 1930 and needs replacement. This system has had numerous breaks; therefore, making fire hydrants unreliable. In addition, the existing buried fire protection system does not cover current site needs, whereas, this project will extend protection to all the site buildings. The new fire protection system needs to be designed and constructed to meet applicable codes and the City of Dearborn Fire Department requirements. This project will also include architectural, building mechanical, electrical, and security related improvements in the administration and ancillary building.

JUSTIFICATION

The professional engineering services procured under Contract GLWA-CS-282 will provide design, construction administration and resident project representation services related to the construction of the site’s entire buried fire protection system and related fire hydrants and other system improvements to the administration building and other ancillary support buildings at the Springwells Water Treatment Plant.

PROJECT ESTIMATE

The pre-proposal estimated cost for the scope of work for this contract was $1,000,000.00.

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.              

Funding Source: Water Construction Bond

Cost Center: Water Engineering

Expense Type: Design (5519-882111.000-617950-114005)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year

FY 2019 Budget                                                                                                         $       20,000.00

FY 2020 Budget                                                                                                                 383,000.00

FY 2021 Budget                                                                                                      186,000.00

FY 2022 Budget                                                                                                                290,000.00

FY 2023 Budget                                                                                                                121,000.00

  Financial Plan Estimate                                                                                    $  1,000,000.00

Proposed Contract Award                                                                                        1,306,152.40

  Negative Estimating Variance                                                               $   (306,152.40)                     

Variance to be funded by a budget amendment from Capital Reserves.

SAVINGS, COST OPTIMIZATION, AND REVENUE ENHANCEMENT IMPACT

This project is the study, design and construction assistance for the
Administration building improvements and underground fire protection loop at the Springwells Water Treatment Plant.  Cost savings are not determinable at the time of this award.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on January 9, 2019.  The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.