File #: 2018-893    Version: 1 Name:
Type: Resolution Status: Passed
File created: 9/6/2018 In control: Board of Directors
On agenda: 9/26/2018 Final action: 9/26/2018
Title: GLWA-CS-151A Reservoir Inspection, Design, and Rehabilitation Project at Imlay Station, Lake Huron Water Treatment Plant (WTP), Springwells WTP, and Southwest WTP
Sponsors: Cheryl Porter
Indexes: Water Operations
Attachments: 1. GLWA-CS-151A Procurement Board Summary, 2. GLWA-CS-151A Bid Tab

Title

GLWA-CS-151A

Reservoir Inspection, Design, and Rehabilitation Project at Imlay Station, Lake Huron Water Treatment Plant (WTP), Springwells WTP, and Southwest WTP

 

Body                     

Agenda of:                     September 26, 2018

Item No.:                     2018-893

Amount:                     $2,164,692.00

 

TO:                     The Honorable

                     Board of Directors

                     Great Lakes Water Authority

 

FROM:                     Sue F. McCormick

                     Chief Executive Officer

                     Great Lakes Water Authority

 

DATE:                     September 6, 2018

 

RE:                     Contract No. GLWA-CS-151A

                     Reservoir Inspection, Design, and Construction Project at Imlay Station, West Service Center, Lake Huron Water Treatment Plant (WTP), Springwells WTP, and Southwest WTP

                     Vendor:  Hazen and Sawyer

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CS-151A “Reservoir Inspection, Design, and Construction Project at Imlay Station, West Service Center, Lake Huron Water Treatment Plant (WTP), Springwells WTP, and Southwest WTP” with Hazen and Sawyer, at a cost not to exceed $2,164,692.00 for a duration of fifty-six (56) months; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

The Michigan Department of Environmental Quality (MDEQ) requires that finished water reservoirs be inspected every three years to determine their condition and make any necessary improvements to the reservoirs to maintain their integrity. The scope of services under this contract includes inspecting the reservoirs to identify the specific scope of improvements to be made, developing design documents to competitively bid construction of any necessary improvements, and administering the construction contract and inspecting the work of the construction contractor.

JUSTIFICATION

Finished water reservoirs must be inspected every three years to comply with MDEQ regulatory requirements. Any deteriorated conditions that are discovered as a result of the inspections must be corrected so that water quality is protected, and the structural integrity of the reservoirs is maintained.

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.

Funding Source: Water Construction Bond

Cost Center: Water Engineering

Expense Type: Construction (5519-882111.000-617950-170801)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year                     Amount

FY 2019 Budget                     $                     472,000.00

FY 2020 Budget                                          583,000.00

FY 2021 Budget                                          260,000.00

FY 2022 Budget                                          260,000.00

FY 2023 Budget                                          260,000.00

FY 2024 Budget                                          225,000.00

Financial Plan Estimate                     $                     2,060,000.00

 

Proposed Contract Award                     $                     2,164,692.00

Negative Estimating Variance                      $                     (104,692.00)

 

SAVINGS, COST OPTIMIZATION, AND REVENUE ENHANCEMENT IMPACT

This project is for the inspection of reservoirs as required by MDEQ.  Cost savings are not determinable at the time of this award.

The award of this contract to the highest-ranking proposer creates a negative estimating variance of $104,692.00. Based on discussion with the project manager sufficient budget within the construction phase is anticipated to be able to fund the negative estimating variance. 

 

Project estimate                     $                     2,060,000.00

Proposed award                                          2,164,692.00

Construction phase adjustment                     $                     (104,692.00)

 

COMMITTEE REVIEW

This item is being presented directly to the full Board of Directors for consideration.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.