Great Lakes Water Authority Logo
File #: 2018-782    Version: 1 Name:
Type: Resolution Status: Passed
File created: 6/7/2018 In control: Board of Directors
On agenda: 6/20/2018 Final action: 6/20/2018
Title: Contract No.: RFB 1127 Hauling and Disposal of Ash and Grit
Sponsors: Suzanne Coffey (WRRF)
Indexes: Wastewater Operations
Attachments: 1. Procurement Board Summary Hauling Ash and Grit, 2. RFB 1127 Bid Tab

Title

Contract No.:   RFB 1127

Hauling and Disposal of Ash and Grit

 

Body                     

Agenda of:                     June 20, 2018

Item No.:                     2018-782

Amount:                         $   624,600.00 2 Years

                                          $   312,300.00 First Year Renewal Option

                                          $   312,300.00 Second Year Renewal Option

Total:                                          $1,249,200.00

 

TO:                     The Honorable

                     Board of Directors

                     Great Lakes Water Authority

 

FROM:                     Sue F. McCormick

                     Chief Executive Officer

                     Great Lakes Water Authority

 

DATE:                     June 7, 2018

 

RE:                     Contract No.:   RFB 1127

                     Hauling and Disposal of Ash and Grit

                     Vendor:  Custom Ecology of Ohio

 

MOTION

Upon the recommendation of Suzanne Coffey, Chief Planning Officer, Interim Chief Operating Officer - Wastewater, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. RFB 1127, “Hauling and Disposal of Ash and Grit” with Custom Ecology of Ohio, at a cost not to exceed $624,600.00 for a duration of two years with two one-year renewal options at $312,300.00 per year; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

 

BACKGROUND

The Water Resource Recovery Facility traditionally uses this proposed contract to remove moistened incinerator ash from ash silos outside of the incineration complex. The scope of work requires the contractor to furnish all labor, materials, supplies, equipment and disposal sites (landfills) necessary for the safe loading, transporting and disposal of the moistened ash estimated to be 18,000 tons per year, into a State approved, licensed landfill.

 

JUSTIFICATION

The NPDES Permit MI0022802 requires the Water Resource Recovery Facility (WRRF) to limit solids discharged into the Detroit River and Rouge River. After dewatering, the biosolids (sludge) are disposed of via the biosolids dryer facility, incineration, land application or burial in an approved type II landfill. After incineration, a vendor is needed to haul and dispose of the ash and grit from incinerators from the Water Resource Recovery Facility to various State approved licensed landfills.

 

FINANCIAL PLAN IMPACT

Summary: The financial plan forecasts a consistent rate of expenditure. The actual rate of spend will vary year to year based on volume. Future financial plans will be adjusted to accommodate the forecasted variance.

 

Funding Source:  Operations & Maintenance Budget

Cost Center: Biosolids Dryer Facility, Central Offloading Facility & Hauling

                     (Sewage Disposal Cost Center 892227)

 

Expense Type: Contractual Operating Services (5960-892227.000-617900-SD9020)

Estimated Cost by Year and Related Forecasted Variance:  See table below.

 Fiscal Year

Current Forecasted Amount

Revised Forecasted Amount

FY 2019 Proposed (prorated) Budget

 $    209,300.00

$    234,225.00

FY 2020 Plan

       279,072.00

312,300.00

FY 2021 Plan

       279,072.00

       312,300.00

FY 2022 Plan

       279,072.00

312,300.00

FY 2023 Plan Pro-rated to 08/31

         69,770.00

      78,075.00

Financial Plan Forecast

 $ 1,116,286.00

$1,249,200.00

Maximum Contract

    1,249,200.00

    1,249,200.00

Forecasting Variance

$  (132,914.00)

   $             0.00

 

 

 

 

SAVINGS, COST OPTIMIZATION, AND REVENUE ENHANCEMENT IMPACT

The increased use of the Biosolids Dryer Facility has resulted in a reduction of volume processed through incineration. This has resulted in an increased cost per ton for this service.

 

Project estimate

$ 15.50 / Ton

Actual bid

$ 17.35 / Ton

Estimate variance

$   1.85 / Ton

 

COMMITTEE REVIEW

This item is being presented directly to the full Board of Directors for consideration.

SHARED SERVICES IMPACT

 This item does not impact the shared services agreement between GLWA and DWSD.