Title
Proposed Change Order No. 1
Contract No. GLWA-DB-226
Repair and Rehabilitation of Detroit River Interceptor (DRI) from Alter Road to Water Resource Recovery Facility (WRRF)
CIP #222002 / BCE Score: 65.4
Body
Agenda of: December 19, 2019
Item No: 2019-426
Amount: Original Contract Price $19,845,500.00
Proposed Change Order No. 1 28,148,335.00
New Contract Total $47,993,835.00
TO: The Honorable
Board of Directors
Great Lakes Water Authority
FROM: Sue F. McCormick
Chief Executive Officer
Great Lakes Water Authority
DATE: December 3, 2019
RE: Proposed Change Order No.1
Contract No. GLWA-DB-226
Repair and Rehabilitation of Detroit River Interceptor (DRI) from Alter Road to Water Resource Recovery Facility (WRRF)
Vendor: Jay Dee Contractors, Inc.
MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-DB-226 Change No. 1 "Repair and Rehabilitation of Detroit River Interceptor (DRI) from Alter Road to Water Resource Recovery Facility (WRRF)" with Jay Dee Contractors, Inc., at an increased cost of $28,148,335.00 for a total cost not to exceed $47,993,835.00; and authorizes the CEO to take such action as may be necessary to accomplish the intent of this vote.
BACKGROUND
The GLWA Conveyance System consists of a network of sewers which collect and transfer wastewater to three major interceptors that direct flow to treatment at the Water Resource Recovery Facility (WRRF). There are three major interceptors: the Detroit River Interceptor (DRI), North West Interceptor (NWI) and North Interceptor East Arm (NIEA). The DRI Runs parallel to the Detroit River and is approximately 13 miles long with a pipe diameter that varies from 8 feet to 16 feet. The DRI carries about 36% of the total flow to WRRF. NWI runs parallel to the Ro...