Title
Proposed Amendment No. 4
Contract No. 1900995/SCN-0000099
Maintenance and Repair of Electrical Equipment
O&M
Body
Agenda of: May 27, 2026
Item No.: 2026-169
Amount: Original Amount $5,717,480.00
Amendment No. 1 0.00
Amendment No. 2 1,963,001.47
Amendment No. 3 2,021,891.51
Proposed Amendment No. 4 920,000.00
Total Contract Amount $10,622,372.98
TO: The Honorable
Board of Directors
Great Lakes Water Authority
FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority
DATE: April 29, 2026
RE: Proposed Amendment No. 4
Contract No. 1900995/SCN-0000099
Maintenance and Repair of Electrical Equipment
Vendor: Motor City Electric
Status: Amendment/Change Order
MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No 1900995/SCN-0000099), Proposed Amendment No. 4, "Maintenance and Repair of Electrical Equipment" with Motor City Electric, at an increased cost of $920,000.00 for a total cost not to exceed $10,622,372.98 and an increased duration of 158 days for a total duration of 2,163 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
GLWA operates many switchgear, transformers, and other electrical power equipment throughout its 43 facilities. The facilities included are nine (9) combined sewer overflow facilities, five (5) water treatment plants, nineteen (19) treated water booster stations, nine (9) stormwater and wastewater pumping stations and the Water Resource Recovery Facility. Each of these facilities includes electrical substations, ranging from one at a small facility to dozens at a large facility. The electrical substations operate high voltage electrical equipment that distributes power to our con...