Great Lakes Water Authority Logo
File #: 2024-285    Version: 1 Name:
Type: Resolution Status: Passed
File created: 8/30/2024 In control: Board of Directors
On agenda: 9/25/2024 Final action: 9/25/2024
Title: Proposed Amendment No. 3 Contract No. 1904337 WRRF PS-2 Bar Racks Replacements and Grit Collection System Improvements CIP #211007/BCE Score: 75.7
Sponsors: Navid Mehram
Indexes: Wastewater Operations
Attachments: 1. 20240911 GLWA OR - CIP 211007 Details v2.pdf

Title
Proposed Amendment No. 3
Contract No. 1904337
WRRF PS-2 Bar Racks Replacements and Grit Collection System Improvements
CIP #211007/BCE Score: 75.7

Body
Agenda of: September 25, 2024
Item No.: 2024-285
Amount: Original Contract $11,307,128.58
Amendment No. 1 496,159.80
Amendment No. 2 0.00
Proposed Amendment No. 3 5,386,323.63
Total Contract Amount $17,189,612.01

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority

DATE: August 30, 2024

RE: Proposed Amendment No. 3
Contract No. 1904337
WRRF PS-2 Bar Racks Replacements and Grit Collection System Improvements
Vendor: Hazen and Sawyer

MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1904337, Proposed Amendment No. 3, "WRRF PS-2 Bar Racks Replacements and Grit Collection System Improvements" with Hazen and Sawyer, at an increased cost of $5,386,323.63 for a total cost not to exceed $17,189,612.01 and an increased duration of 132 days for a total duration of 2,535 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
GLWA contracted the engineering firm of Hazen and Sawyer in October 2020 to perform planning, preliminary design, detailed design, and construction services for the Pump Station-2 Bar Racks Replacements and Grit Collection System Improvements (PS2RG) project.
Project improvements include:
* Replacing the existing bar screens with new screens that have narrower openings.
* Replacing the existing screenings conveyor belt with a sluicing trough flowing to dual drum screen and compactors.
* Retrofitting the existing aerated grit tanks with vortex grit remova...

Click here for full text