Contract No. 2102618
Baby Creek CSO Facility Screen Rehabilitation
Vendor: Commercial Contracting Corporation
Body
Agenda of: March 23, 2022
Item No.: 2022-096
Amount: $2,326,000.00
TO: The Honorable
Board of Directors
Great Lakes Water Authority
FROM: Suzanne R. Coffey, P.E.
Interim Chief Executive Officer
Great Lakes Water Authority
DATE: March 2, 2022
RE: Contract No. 2102618
Baby Creek CSO Facility Screen Rehabilitation
Vendor: Commercial Contracting Corporation
MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Interim Chief Executive Officer (ICEO) to enter into Contract No. 2102618, "Baby Creek CSO Facility Screen Rehabilitation" with Commercial Contracting Corporation, at a cost not to exceed $2,326,000.00 for a duration of 590 days; and authorizes the ICEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
GLWA conducted a study which included condition assessments by the manufacturer of all critical equipment at all nine (9) CSO Facilities. Screens are considered critical equipment at all CSO facilities, but are vital to a screening and disinfection facility such as Baby Creek, as they enable the facility to treat influent flow at an extremely high rate. A malfunction of a screen can be a cascading failure of other adjacent screen that could impact the ability for the facility to operate as designed.
The Baby Creek facility screens were inspected in May of 2021 and the inspection revealed that the screens are in poor condition. The mechanical elements of screens 2 through 16 were inspected (screen 1 was recently rebuilt) and many of the mechanical components of the screens were found to be in poor condition with majority of the mechanical components in need of replacement. The manufacturer recommended replacement in the next 12-24 months giv...