On agenda: 3/26/2025 Final action: 3/26/2025
Title: Requisition No. Req-0001210 Conner Creek Pump Station Storm Water Pump Replacements CIP# 232002/BCE Score: 94.1
Sponsors: Navid Mehram
Indexes: Wastewater Operations
Attachments: 1. Req-0001210.ProcurementBoardReport, 2. Req-0001210.CostTabulation, 3. Req-0001210.CIP232002Plan

Title
Requisition No. Req-0001210
Conner Creek Pump Station Storm Water Pump Replacements
CIP# 232002/BCE Score: 94.1

Body
Agenda of: March 26, 2025
Item No.: 2025-067
Amount: $35,360,000.00

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority

DATE: March 3, 2025

RE: Requisition No. 0001210
Conner Creek Pump Station Storm Water Pump Replacements
Vendor: Kokosing Industrial, Inc.
Status: New Contract/PO


MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Requisition No. 0001210, "Conner Creek Pump Station Storm Water Pump Replacements" with Kokosing Industrial, Inc., at a cost not to exceed $35,360,000.00 for a duration of 1,349 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.


BACKGROUND
The Conner Creek Storm Pump Station was constructed in the 1920's and has a firm pumping capacity of 2.2 billion gallons per day. The two (2) 14-foot diameter East and West Jefferson Relief Sewers convey both sanitary (i.e. dry weather) and storm water (i.e. wet weather) flows to the pump station. During wet weather, if flow exceeds the adjacent Conner Creek Sanitary Pump Station, the Conner Creek Storm Pump Station is activated to pump the excess flow to the Conner Creek Combined Sewer Overflow Facility. The operation of the Conner Creek Storm Pump Station is critical to help prevent flooding in the Eastern portion of our service area. The design of the Conner Creek Storm Water Pumps requires that the pumps be primed prior to starting, utilizing a vacuum priming system. The vacuum priming process is complex and time-consuming, which results in extended startup times and increased risk of failures to start due to complex...