File #: 2019-044    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/6/2019 In control: Board of Directors
On agenda: 2/27/2019 Final action: 2/27/2019
Title: Proposed Change Order No. 2 GLWA-CON-109 Emergency Refurbishment of Storm Pumps 5 and 7, Upgrade of Pump 5 and Motor Control Center Upgrade for Eight Storm Pumps for Freud Sanitary Pump Station (CIP# 232002)
Sponsors: Cheryl Porter
Indexes: Water Operations
Title
Proposed Change Order No. 2
GLWA-CON-109
Emergency Refurbishment of Storm Pumps 5 and 7, Upgrade of Pump 5 and Motor Control Center Upgrade for Eight Storm Pumps for Freud Sanitary Pump Station
(CIP# 232002)

Body
Agenda of: February 27, 2019
Item No.: 2019-044
Amount: Original Contract Price $ 3,963,889.86
Change Order No. 1 886,684.07
Change Order No. 2 0.00
New Contract Total $ 4,850,573.93

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Sue F. McCormick
Chief Executive Officer
Great Lakes Water Authority

DATE: February 6, 2019

RE: Proposed Change Order No. 2
Contract No. GLWA-CON-109
Emergency Refurbishment of Storm Pumps 5 and 7, Upgrade of Pump 5 and Motor Control Center Upgrade for Eight Storm Pumps for Freud Sanitary Pump Station
Vendor: Lakeshore Global Corporation


MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CON-109 Change Order No. 2 "Emergency Refurbishment of Storm Pumps 5 and 7, Upgrade of Pump 5 and Motor Control Center Upgrade for Eight Storm Pumps for Freud Sanitary Pump Station" with Lakeshore Global Corporation, at a cost not to exceed $4,850,573.93 and for an increased duration of 365 days for a total contract duration of 1,156 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
The Freud Sanitary Pump Station (SPS) was originally built in 1956 as a storm water pump station. The Freud SPS has eight large storm water pumps with a capacity of 290 million gallons per day (MGD) each. In addition, there are two smaller pumps rated at a capacity of 13 and 25 MGD each. These smaller pumps were originally designed as intermittent dewatering pumps, but later became continuous duty sanitary pumps during ...

Click here for full text