Title: Requisition No. REQ-0008187 Primary Area Gas Detection System Upgrade and Switchgear Replacement at Electrical Bldg. EB-20 CIP #211009 / BCE Score: 76.6
Sponsors: Navid Mehram
Indexes: Wastewater Operations
Attachments: 1. REQ-0008187 Cost Tabulation, 2. REQ-0008187 Vendor Response Follow-up, 3. REQ-0008187 Procurement Board Report
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title
Requisition No. REQ-0008187
Primary Area Gas Detection System Upgrade and Switchgear Replacement at Electrical Bldg. EB-20
CIP #211009 / BCE Score: 76.6

Body
Agenda of: August 26, 2026
Item No.: 2026-301
Amount: $9,507,315.00

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority

DATE: July 29, 2026

RE: Requisition No.: REQ-0008187
Primary Area Gas Detection System Upgrade and Switchgear Replacement at Electrical Bldg. EB-20
Vendor: Rotor Electric Company of Michigan, LLC
Status: New Contract/PO

MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Requisition No. REQ-0008187, "Primary Area Gas Detection System Upgrade and Switchgear Replacement at Electrical Bldg. EB-20" with Rotor Electric Company of Michigan, LLC, at a cost not to exceed $9,507,315.00 for a duration of 1,443 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
This project involves critical upgrades to the Water Resource Recovery Facility (WRRF) to the electrical and safety systems supporting the primary clarifier area and associated facilities. The work includes the demolition and replacement of Unit Substation SD-1 in Electrical Building EB-20 along with the removal and installation of new 480-volt feeder cables to existing loads. Network wiring and configuration changes will be added to the existing Ovation control system to improve monitoring of substation and power statuses. In addition, the project replaces aging gas detection equipment across Scum Buildings Nos. 1 through 14, meter vaults Nos.13 through 18, Sludge Pump Stations Nos. 1 and 2 and the Scum Concentration Building. Proposed upgrades include new gas detection devi...