Title
Proposed Amendment No. 3
Contract No. 1802448
Engineering Services for the 14 Mile Transmission Main Loop
CIP #122013 / BCE Score: 58.4
Body
Agenda of: October 26, 2022
Item No.: 2022-446
Amount: Original Contract $6,819,890.00
Amendment No. 1 1,150,000.00
Amendment No. 2 1,662,726.00
Proposed Amendment No. 3 250,000.00
Total Revised Contract $9,882,616.00
TO: The Honorable
Board of Directors
Great Lakes Water Authority
FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority
DATE: September 30, 2022
RE: Proposed Amendment No. 3
Contract No. 1802448
Engineering Services for the 14 Mile Transmission Main Loop
Vendor: Brown and Caldwell, LLC
MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1802448 Proposed Amendment No. 3 "Engineering Services for the 14 Mile Transmission Main Loop" with Brown and Caldwell, LLC, at an increased cost of $250,000.00 for a total cost not to exceed $9,882,616.00, with no increase in duration for a total of 2,132 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
Contract No. 1802448 is an engineering contract involving design, bid, construction administration, and resident project representation (RPR) for construction of redundant and parallel transmission mains to provide redundancy for the communities serviced by the existing 14 Mile transmission main. The existing 14 Mile transmission main is a single line that supplies drinking water to the communities of Novi, Farmington Hills, West Bloomfield, Commerce, Walled Lake, and Wixom. If a disruption to service occurs on the 14 Mile transmission main (e.g., air valve break, blow-off valve break, water main break), then these communities w...