Proposed Amendment No. 3
Contract No. 1900455-1/SCN-0000287
Architectural, Engineering, and Design Services
O&M
Body
Agenda of: February 25, 2026
Item No.: 2026-029
Amount: Original Contract $400,000.00
Amendment No. 1 0.00
Amendment No. 2 0.00
Proposed Amendment No. 3 0.00
Total Contract Amount $400,000.00
TO: The Honorable
Board of Directors
Great Lakes Water Authority
FROM: Suzanne R. Coffey, P.E.
Chief Executive Officer
Great Lakes Water Authority
DATE: January 30, 2026
RE: Proposed Amendment No. 3
Contract No. 1900455-1/SCN-0000287
Architectural, Engineering, and Design Services
Vendor: SDG Associates, LLC
Status: Amendment/Change Order
MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1900455-1/SCN-0000287, Proposed Amendment No. 3, "Architectural, Engineering, and Design Services" with SDG Associates, LLC, with no increase in cost for a total cost not to exceed $400,000.00, and an increased duration of 842 days for a total duration of 2,669 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND
GLWA has multiple facilities that require architectural, engineering design services, including but not limited to: GLWA office facilities, the five (5) water treatment plants, treated water booster pumping stations, wastewater pumping stations, wastewater CSOs, and water resource recovery facilities. The services contract provides architectural and engineering design and documentation assistance for planned improvements and/or repairs to GLWA Facilities. The documentation produced is used for planning, soliciting bids, estimating and construction services.
SDG Associates, LLC, Contract No. 1900455-1 has been working with...