File #: 2018-894    Version: 1 Name:
Type: Resolution Status: Passed
File created: 9/6/2018 In control: Board of Directors
On agenda: 9/26/2018 Final action: 9/26/2018
Title: Contract No. GLWA-CS-152 Proposed Change Order 1 Route Alternatives Analysis and Preliminary Design for the Water Works Park to Northeast Transmission Main
Sponsors: Cheryl Porter
Indexes: Water Operations
Title
Contract No. GLWA-CS-152
Proposed Change Order 1
Route Alternatives Analysis and Preliminary Design for the Water Works Park to Northeast Transmission Main

Body
Agenda of: September 26, 2018
Item No.: 2018-894
Amount: $1,634,378.00

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Sue F. McCormick
Chief Executive Officer
Great Lakes Water Authority

DATE: September 6, 2018

RE: Proposed Change Order No. 1
Contract No. GLWA-CS-152
Route Alternatives Analysis and Preliminary Design for the Water Works Park to Northeast Transmission Main
Vendor: Jacobs Engineering


MOTION
Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CS-152 Change Order No. 1 "Route Alternatives Analysis and Preliminary Design for the Water Works Park to Northeast Transmission Main" with Jacobs Engineering, a cost increase of $1,634,378.00 for a total cost not to exceed $4,447,594.63 and a contract extension of 11 months for a total contract duration of 1 year and 11 months; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.



BACKGROUND
GLWA-CS-152 was initiated on September 11, 2017 for a period of twelve (12) months expiring September 10, 2018. The purpose of the ongoing Route Alternatives Analysis and Preliminary Design for the Water Works Park to Northeast Transmission Main project is to advance the preliminary design of a new finished water transmission main from the Water Works Park Water Treatment Plant (WTP) to the Northeast WTP as recommended in the 2015 Water Master Plan Update. The new water transmission main is proposed to be approximately 81 inches in diameter and will traverse approximately seven (7) miles through an urbanized setting on the east side of Detroit. The new water transmission main w...