File #: 2025-178    Version: 1 Name:
Type: Resolution Status: New Business
File created: 5/29/2025 In control: Operations and Resources Committee
On agenda: 6/11/2025 Final action:
Title: Requisition No. 2400082/REQ-0000330 Northeast Water Treatment Plant Filter Replacement CIP #112008 / BCE Score: 93.50
Sponsors: Cheryl Porter
Indexes: Water Operations
Attachments: 1. 2400082 (REQ-0000330) Procurement Board Report, 2. 2400082 Cost Tabulation, 3. 2400082 Vendor Response Follow-Up
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Requisition No. 2400082/REQ-0000330

Northeast Water Treatment Plant Filter Replacement

CIP #112008 / BCE Score: 93.50

Body

Agenda of:                     June 25, 2025

Item No.:                     2025-178

Amount:                     $138,989,000.00

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     May 29, 2025

 

RE:                                          Requisition No. 2400082/REQ-0000330

                                          Northeast Water Treatment Plant Filter Replacement

                                          Vendor:  Kokosing Industrial, Inc.

                                          Status: New Contract/PO

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Requisition No. 2400082/REQ-0000330, “Northeast Water Treatment Plant Filter Replacement” with Kokosing Industrial, Inc., at a cost not to exceed $138,989,000.00 for a duration of 1,825 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

This proposed contract is a design-build contract focused on the rehabilitation of the filters at the Northeast Water Treatment Plant. Filter components including underdrains, media, wash water troughs, surface wash water equipment, wash water equipment, and filter controls are original to the late-1950s plant construction. These filter components have exceeded their useful design life, with mechanical components of the filters being inoperable resulting in excessive maintenance required to meet treatment criteria and system demands.

The work includes rehabilitation of the existing filter clay underdrain system, removal and replacement of the existing filter media, wash water troughs, surface wash water equipment, filter control system, wash water system improvements, and miscellaneous architectural and mechanical improvements to the Wash Water Building and Filter Building. Improvements will right size the filtration capacity from 300 million gallons per day (MGD) to 190 MGD. The proposed contract is anticipated to be substantially completed by December 31, 2029.

JUSTIFICATION

Improvements under this proposed contract are necessary to meet the requirements of the agreed upon terms of the Administrative Compliance Agreement (ACA-399-15-2023) between the Great Lakes Water Authority and the State of Michigan.

FINANCIAL PLAN IMPACT

Summary:  Sufficient funds are provided in the financial plan for this project.

Funding Source:  5519 - Water Construction Fund

Cost Center:  880000 - Capital Improvement Fund

Expense Type:  616900 - Construction

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year

FY 2026 Planned Spend                                                                                                         $                   0.00

FY 2027 Planned Spend                                                                                                              19,871,000.00

FY 2028 Planned Spend                                                                                                              30,189,000.00

FY 2029 Planned Spend                                                                                                              25,568,000.00

FY 2030 Planned Spend                                                                                                                8,872,000.00

Financial Plan Estimate                                                                                                         $   84,500,000.00

Proposed Contract Award                                                                                                            138,989,000.00

Estimating Variance                                                                                                                              $  (54,489,000.00)

FY 2026 Plan Spend per CIP                                                                                    $                   0.00

FY 2026 Plan Spend adjusted for award value                                                 8,000,000.00

FY 2026 Estimating Variance                                                                                    $    (8,000,000.00)

The proposed contract scheduling was pulled forward resulting in a negative estimating variance for FY26.  A budget amendment will be made for use of Capital Reserves for FY26 in the amount of $8,000,000.00.  The balance of the estimating variance has been adjusted for in future CIP Plan documents.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on June 11, 2025.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.