Title: Proposed Change Order No. 1 GLWA-CON-158 Specialized Services Contract
Sponsors: Cheryl Porter, Todd King
Indexes: Water Operations

Title

Proposed Change Order No. 1

GLWA-CON-158

Specialized Services Contract

 

                     

Body

Agenda of:                     April 24, 2019

Item No.:                     2019-149

Amount:                     Original Contract                                                               $10,092,799.90

                                          Proposed Change Order No. 1                         5,046,399.95

                                          Total Revised Contract                                          $15,139,199.85

 

TO:                     The Honorable

                     Board of Directors

                     Great Lakes Water Authority

 

FROM:                     Sue F. McCormick

                     Chief Executive Officer

                     Great Lakes Water Authority

 

DATE:                     April 3, 2019

 

RE:                                          Proposed Change Order No. 1

                     Contract No. GLWA-CON-158

                     Specialized Services Contract

                     Vendor:  LGC Global, Inc.

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CON-158 Change Order No. 1 “Specialized  Services Contract” with LGC Global, Inc., at an increased amount of $5,046,399.95 for a total cost not to exceed $15,139,199.85 for an increased duration of one (1) year for a total contract length of three (3) years; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

 

 

BACKGROUND

The Specialized Services contracts have successfully been utilized to assist the Authority with unique projects to stay in compliance with state and federal regulations. They also provide the necessary support for urgent and emergency tasks that require immediate attention. Specifically, GLWA’s major maintenance responsibilities include the performance of corrective (i.e. immediate/urgent/emergency) and preventive (i.e. regularly scheduled intervals) on huge pumping units, motors, valves, and related support equipment at the Water Treatment Plants (WTP), Water Booster Stations (WBS), Pressure Regulating Valves (PRVs), Remote Sites, Sewer Lift Stations, and outfalls. The current contract, GLWA-CON-158, was advertised with the intent to award a two-year contract with subsequent annual renewal options for a period not to exceed three years. However, the renewal option language was inadvertently dropped from the associated contract language. This Change Order No. 1 seeks to amend the contract for a period of one year.

JUSTIFICATION

The CON-158 Specialized Services Contract is needed to accomplish a number of unique projects throughout the water treatment plants, water booster stations and wastewater collection system to keep these systems in operation. GLWA handles the base load of maintenance work. For peak loads, GLWA employees do not have sufficient equipment and staff necessary to perform all the specialized functions in addition to providing emergency maintenance work. This type of contract exists to provide the 24/7 operations with sufficient resources.

Award of CON-158 is crucial for the Authority to augment its equipment and provide specialized services to maintain the facilities, in order to comply with state and federal regulatory agencies directives assuring the health and welfare of GLWA customers in the area of water treatment, water transmission, sewage transport, collection, and discharge. This contract gives GLWA the flexibility to bring on additional specialized resources when the need arises. The original two-year contract had an upper limit of $10,092,799.90 and this change order requests an additional one year and $5,046,399.95 to reflect the current rate of utilization for this contract.

PROJECT MANAGEMENT STATUS

Original Contract Time                                            2 Years

Proposed Change Order 1                        1 Year

New Contract Time                                                                 3 Years

PROJECT ESTIMATE

Original Contract Price                                          $10,092,799.90

Proposed Change Order No. 1                          5,046,399.95

New Contract Total                                                               $15,139,199.85

FINANCIAL PLAN IMPACT

Summary: The proposed contract with Lakeshore Global Corporation encompasses Operations & Maintenance expense only.  The value of the contract is within the current financial plan in total.  Sufficient funds will be provided in the Operations & Maintenance (O&M) financial plan for this contract related to contractual operating services, contractual professional services and repairs & maintenance.

Funding Source:  Operations & Maintenance (O&M) Budget

Cost Center(s):

Systems Control Operations                     Centralized Services cost center 882301

Field Service Operations                                          Centralized Services cost center 882431

Belle Isle Pump Station                                          Wastewater Operations cost center 892342

Blue Hill Pump Station                                          Wastewater Operations cost center 892343

Fischer Pump Station                                          Wastewater Operations cost center 892347

Woodmere Pump Station                                          Wastewater Operations cost center 892352

Expense Type(s): Contractual Operating Services (617900) 

                     Contractual Professional Services (617903)

                     Repairs & Maintenance-Equipment (622300)

 

 

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year                                                                                                                                                                           Amount

FY 2018 Budget                                                                                                                              $5,046,400

FY 2019 Budget                                                                                                                                5,046,400

FY 2020 Financial Plan                                                                                                            6,677,300

                     Total Financial Plan Estimate                              $16,770,100

           Proposed Contract Amount                                                                        $15,139,200

Variance (positive/ (negative)                                                                                               $1,630,900

 

SAVINGS, COST OPTIMIZATION, AND REVENUE ENHANCEMENT IMPACT

The award of this contract provides a variance of $1,630,900 ($16,770,100 financial plan estimate less $15,139,200 proposed contract amount). Contractual services are dependent on several factors such as, delays in estimated start and end dates, environmental constraints, and other unforeseen circumstances that can cause the expenses to fluctuate from fiscal year to fiscal year.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on April 11, 2019. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.