Title: Proposed Amendment No. 2 Contract No. GLWA-CS-120 Freud and Conner Creek Pump Station Improvements Study and Design CIP# 232002 / BCE Score: 79.6
Sponsors: Cheryl Porter, Todd King
Indexes: Water Operations

Title

Proposed Amendment No. 2

Contract No. GLWA-CS-120

Freud and Conner Creek Pump Station Improvements Study and Design

CIP# 232002 / BCE Score: 79.6

 

Body

Agenda of:                      October 28, 2020

Item No.:                     2020-349

Amount:                     Original Contract Amount                                                               $  4,416,547.48

                                          Amendment No. 1                                                                                                      0.00

                                          Proposed Amendment No. 2                                            19,994,400.00

                                          Total Contract Amount                                                                $24,410,947.48

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Sue F. McCormick

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     October 7, 2020

 

RE:                                          Proposed Amendment No. 2

                                          Contract No. GLWA-CS-120

                                          Freud and Conner Creek Pump Station Improvements Study and
                                          Design

                                          Vendor:  Arcadis of Michigan, LLC

 

                     

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. GLWA-CS-120 Proposed Amendment No. 2 “Freud and Conner Creek Pump Station Improvements Study and Design” with Arcadis of Michigan, LLC, at an increased cost of $19,994,400.00 for a total cost not to exceed $24,410,947.48, and an increased duration of 69 months for a total duration of 133 months; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

 

 

BACKGROUND

The Freud and Conner Creek pump stations are the two largest pumping facilities in the GLWA system.  They each have a 2 billion gallon per day capacity to discharge combined storm and sanitary water to treatment at the Conner Creek CSO control facility prior to discharge to the Detroit River during wet weather events.  During dry weather, each station pumps sanitary sewage to the Detroit River Interceptor (DRI) which directs flow to the WRRF for treatment.

The Conner Creek pump station was originally constructed in 1928 as a storm water pumping station.  A sanitary pump station was added in 1958. The Freud pump station was built in 1956 as a storm water pump station.  Sanitary flows were directed to the DRI using Freud pumps originally designed for dewatering the station.  The service area for both stations encompasses the northeastern portion of Detroit, and portions of adjacent suburbs.  All of the Jefferson-Chalmers neighborhood is served by these stations.

In 2005, the Conner Creek CSO facility was constructed and made changes to the Conner Creek pump station discharge that resulted in failure of the pump station to be able to prime and put the pumps in service. The original Capital Improvement Plan (CIP) business case evaluation (BCE) prepared in 2016 estimated the project at approximately $22.5 million for design and construction over a period of five years.  The design phase of the project was initiated and a design contract with Arcadis was initiated in 2017 with a fee of $4.4 million. Upon completion of the condition assessment at each facility, it became clear that the overall scope of the recommended improvements would result in a need to increase the budget by an order of magnitude. This drastic increase in budget triggered a request by member partners to initiate a value engineering (VE) study to review proposed alternatives and ensure GLWA was proceeding on the most cost-effective path moving forward with respect to upgrading the largest two pump stations within the GLWA system.

GLWA secured a VE team that was comprised of two independent consultants and two member partners and convened a series of meetings to review the Arcadis developed alternatives. The VE team quickly developed a consensus opinion that selected upgrade recommendations for the Conner Creek sanitary pump station, the Freud sanitary pump station, and the Freud storm pump station were appropriate and did not require further study by the VE team.

The rest of the VE efforts were focused on defining five alternatives and selecting the most viable alternative to address the 92-year-old Conner Creek storm water pumping station. The alternatives developed had estimated capital costs that ranged from $120 million to $220 million. After detailed analysis and discussion with the VE team, presentations to the Board (Capital Planning Committee-October 15, 2019; O&R Committee-November 13, 2019) and presentations to Member Partners at the Wastewater Analytical Task Force (October 4, 2019, and May 7, 2020), GLWA has determined that Alternative 2 - construction of a new 2.2 billion gallon per day facility - represents the best alternative on a net present value basis, over a 40-year planning horizon.

JUSTIFICATION

The purpose of this Amendment No. 2 is to allow the Freud and Conner Creek pump station projects to proceed without additional delays to complete the design and allow for public competitive solicitation as a traditional design, bid, build project delivery method.  The pump stations each have operational issues that, if un-addressed, could negatively impact the communities served, particularly in the Jefferson-Chalmers area.

Amendment No. 2 for the Arcadis contract is to provide design and services through the completion of construction for two construction bid packages, one for Freud and one for Conner Creek.  This extensive amendment is justified based on the tremendous increase in scope from when the project was originally bid.

This provides for a new total design and services during construction budget to complete both stations for a total cost of $24.4 million as compared to the original budget of $4.4 million.

The amendment requests that time is extended for 2,093 days (approximately 69 months) for a revised completion date of June 30, 2028. The current CIP is carrying $220 million for the capital cost for both stations.  The design and services during construction, as a fraction of the total cost, is approximately 11%. This is in line with typical industry metrics.

PROJECT MANAGEMENT STATUS

Original Contract Time                                                                  64 months

Amendment No. 1                                                                                        0 months

Proposed Amendment No. 2                                            69 months

New Contract Time                                                                                     133 months

PROJECT ESTIMATE

Original Contract Price                                                                $  4,416,547.48

Amendment No. 1                                                                                                      0.00

Proposed Amendment No. 2                                             19,994,400.00

New Contract Total                                                                                     $24,410,947.48

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.              

Funding Source: Wastewater Construction Bond

Cost Center: Wastewater Engineering

Expense Type: Construction (5421-892211.000-617950-232002)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Original Contract Price                                                                                      $4,416,547.48

Amendment No. 1                                                                                                                           0.00

Proposed Amendment No. 2                                                                 19,994,400.00

New Contract Total                                                                                                           24,410,947.48

  Amended Financial Plan Estimate                                            24,410,947.48

Estimating Variance                                                                                                               $0.00

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on October 15, 2020. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.