Skip to main content
Great Lakes Water Authority Logo
File #: 2024-236    Version: 1 Name:
Type: Resolution Status: Passed
File created: 6/27/2024 In control: Board of Directors
On agenda: 7/24/2024 Final action: 7/24/2024
Title: Proposed Change Order No. 1 Contract No. 2201142 Conveyance System Infrastructure Improvements: Sewer In-System Storage and Valve Remote Improvements CIP #260701/ BCE Score: 60.1
Sponsors: Navid Mehram
Indexes: Wastewater Operations

Title

Proposed Change Order No. 1

Contract No. 2201142

Conveyance System Infrastructure Improvements: Sewer In-System Storage and Valve Remote Improvements                     

CIP #260701/ BCE Score: 60.1

 

Body

Agenda of:                      July 24, 2024

Item No.:                     2024-236

Amount:                     Original Contract                                                                                    $15,943,539.92

                                          Proposed Change Order No. 1                                                            0.00

                                          Total Contract Amount                                                               $15,943,539.92

                                                                                                                                                                                                                                       

TO:                                          The Honorable

Board of Directors

Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     June 27, 2024

 

RE:                                          Proposed Change Order No. 1

                     Contract No.  2201142

                     Conveyance System Infrastructure Improvements: Sewer In-System Storage and Valve Remote Improvements

                     Vendor:  LGC Global, Inc.

 

MOTION

 

Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 2201142, Proposed Change Order No. 1, “Conveyance System Infrastructure Improvements: Sewer In-System Storage and Valve Remote Improvements” with LGC Global, Inc., with no increase in cost for a total cost not to exceed $15,943,539.92 and an increased duration of 240 days for a total duration of 1,043 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

 

BACKGROUND

The scope of work for this contract includes improvements to 35 sites, which includes the 16 in-system storage dam (ISD) locations and 11 of the 20 valve remote (VR) sites, and rehabilitation to eight regulator/diversion chamber sites. The ISD sites are comprised of inflatable dams that are naturally in a deflated state but can be inflated during times of elevated flow to utilize GLWA’s in-system storage and reduce Combined Sewer Overflows (CSOs). Typically, these devices are operated for smaller storms that produce peak flows less than the downstream regulator and/or existing sewer capacities. A portion of the scope required the contractor to perform an inspection of the inflatable dams to assess the condition and perform rehabilitation or repairs at the direction of the engineer and GLWA. After the inspection, necessary repairs were identified for the ISDs. The contract contained a provisional allowance for performing said repairs as directed by the engineer.

JUSTIFICATION

This change order is required to provide sufficient contract time to allow the contractor to perform the engineer-directed repairs to the inflatable dams. Seasonal flow conditions within the affected sewers and coordination with other ongoing projects within the conveyance system necessitate the amount of additional contract time included in this change order. For the reasons described above, it is Wastewater Engineering’s recommendation that the Substantial Completion date be extended by 240 days to May 23, 2025, and the Final Completion date be extended by 240 days to July 22, 2025.

 

PROJECT MANAGEMENT STATUS

Original Contract Time                                           803 days (09/14/2022 - 11/24/2024)

Proposed Change Order No. 1                     240 days (11/25/2024 - 07/22/2025)

New Contract Time                                                  1,043 days (09/14/2022 - 07/22/2025)

 

 

 

PROJECT ESTIMATE

Original Contract Price                                           $15,943,539.92

Proposed Change Order No. 1                                                   0.00

New Contract Total                                                                $15,943,539.92

 

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.          

Funding Source: Wastewater Construction Fund

Cost Center: Wastewater Field Engineering

Expense Type: Construction (5421-892411.000-616900-260701)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Original Contract Price                                                                        $15,943,539.92

Proposed Change Order No. 1                                                                               0.00

New Contract Total                                                                                                         15,943,539.92

Amended Financial Plan Estimate                                          15,944,000.00

Estimating Variance                                                                                             $           460.08

 

This proposed change order is for an extension of time only and there is no substantive financial impact. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on July 10, 2024. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.