Title

Contract No. 2300394

Replacing and Rehabbing Select Roofs at the WRRF

CIP #260802 / BCE Score: 77.9

 

Body

Agenda of:                      November 16, 2023

Item No.:                     2023-409

Amount:                     $3,957,500.00                                                                                                                                                                                                                  

TO:                                          The Honorable

Board of Directors

Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     October 27, 2023

 

RE:                     Contract No.  2300394

                     Replacing and Rehabbing Select Roofs at the WRRF

                     Vendor:  Schreiber Corporation

 

 

MOTION

 

Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 2300394, “Replacing and Rehabbing Select Roofs at the WRRF” with Schreiber Corporation, at a cost not to exceed $3,957,500.00 for a duration of 760 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote.

 

 

BACKGROUND

GLWA recently completed a study to assess 50 existing building roofs (189 buildings total) that were reported to be in the worst condition on the 130-acre Water Resource Recovery Facility (WRRF) site. Each inspection generated a report and assessment of the overall condition of the roof and then prioritized against each other with the worst roofs reflecting the greatest operational risk due to failure being prioritized ahead of others. A design was then completed for the first package of four roofs to be addressed under this roof improvements program (260800). Other design packages were developed and will be bid out in subsequent years in accordance with the GLWA CIP Program for the WRRF Roof Improvements.

JUSTIFICATION

This project rehabilitates multiple roofs, providing protection from the elements for critical process equipment inside of the facilities. The buildings include the Scum Concentrator Building, Central Offload Facility, Dewatering Complex I, and the Maintenance Building. The roofs chosen for rehabilitation have significant wear/damage and are nearing the end of their expected useful life.  It is necessary to perform this project in order to ensure the equipment inside of these buildings is able to continue to operate properly and keep the WRRF in compliance with the National Pollutant Discharge Elimination System (NPDES) Permit.

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.              

Funding Source: Wastewater Construction Bond

Cost Center: Wastewater Field Engineering

Expense Type: Construction (5421-892211.000-616900-260802)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year

FY 2024 Plan                                                                                                            $2,143,000.00

FY 2025 Plan                                                                                                              2,135,000.00

Financial Plan Estimate                                                                             $4,278,000.00

Proposed Contract Award                                                                                         3,957,500.00

Estimating Variance                                                                                                     $320,500.00

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on November 8, 2023. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.