File #: 2026-030    Version: 1 Name:
Type: Resolution Status: New Business
File created: 1/30/2026 In control: Board of Directors
On agenda: 2/25/2026 Final action:
Title: Proposed Amendment No. 2 Contract No. 1900455-2/SCN-0000287 Architectural, Engineering, and Design Services CIP #112007/BCE: 95.2
Sponsors: Cheryl Porter
Indexes: Water Operations

Title

Proposed Amendment No. 2

Contract No. 1900455-2/SCN-0000287

Architectural, Engineering, and Design Services

CIP #112007/BCE: 95.2

Body                     

Agenda of:                     February 25, 2026

Item No.:                     2026-030

Amount:                     Original Contract                                                               $400,000.00

                                          Amendment No. 1                                                                 504,040.00

                                          Proposed Amendment No. 2                                              0.00

                                          Total Contract Amount                                          $904,040.00

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     January 30, 2026

 

RE:                                          Proposed Amendment No. 2

                                          Contract No. 1900455-2/SCN-0000287

                                          Architectural, Engineering, and Design Services

                                          Vendor: WSP Michigan, Inc.

                                          Status: Amendment/Change Order

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1900455-2/SCN-0000287, Proposed Amendment No. 2, “Architectural, Engineering, and Design Services” with WSP Michigan, Inc., with no increase in cost at a total cost not to exceed $904,040.00 and an increased duration of 730 days for a total duration of 2,666 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

 

BACKGROUND

GLWA has multiple facilities that require architectural, engineering design services, including but not limited to: GLWA office facilities, the five (5) water treatment plants, treated water booster pumping stations, wastewater pumping stations, wastewater CSOs, and water resource recovery facilities. The services contract is to provide architectural and engineering design and documentation assistance for planned improvements and/or repairs to GLWA Facilities. The documentation produced is used for planning, soliciting bids, estimating and construction services.

WSP Michigan, Inc., Contract No. 1900455-2 has been working with GLWA Facilities and the Northeast Water Plant Engineer on engineering and documentation of much needed structural repairs to the Plant. The engineering, documentation and bidding and award process have been completed, and the construction contract has been awarded. WSP Michigan, Inc. is needed to continue to provide services during construction.

JUSTIFICATION

The existing five-year Contract No. 1900455-2 will expire July 1, 2026, and this two-year contract extension will allow GLWA to maintain its current Architectural and Engineering Services team (WSP Michigan, Inc.) through the completion of the Northeast Water Treatment Plant Header Galleries and Wastewater Building Structural Repairs project (CIP 112007). The construction portion of the project is anticipated to begin in January 2026 and last through July 1, 2028. This is a time only extension request.

PROJECT MANAGEMENT STATUS

Original Contract Time                                              730 days                     (03/12/2021 - 03/12/2023)

Amendment No. 1                                                               1,206 days                     (03/13/2023 - 07/01/2026)

Proposed Amendment No. 2                        730 days                     (07/02/2026 - 07/01/2028)

New Contract Time                                                                2,666 days                     (03/12/2021 - 07/01/2028)

PROJECT ESTIMATE

Original Contract Price                                           $400,000.00

Amendment No. 1                                                                 504,040.00

Proposed Amendment No. 2                                  0.00

New Contract Total                                                                $904,040.00

 

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.          

Funding Source: Water Construction Fund

Cost Center: Water Engineering

Expense Type: Design (5519-880000-617950-112007)

Estimated Cost by Year and Related Estimating Variance:  N/A

This proposed amendment is for an extension of time only. Although the amendment extends the final completion date into FY 2029, there is no substantive financial impact.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on February 11, 2026. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.