Skip to main content
Great Lakes Water Authority Logo
File #: 2026-081    Version: 1 Name:
Type: Resolution Status: New Business
File created: 2/27/2026 In control: Operations and Resources Committee
On agenda: 3/11/2026 Final action:
Title: Proposed Amendment No. 2 Contract No. 2202790/SCN-0000382 Water Resource Recovery Facility (WRRF) Improvements to the Sludge Feed System for Solids Processing Engineering Services CIP #213006/BCE Score: 76.60
Sponsors: Navid Mehram
Indexes: Wastewater Operations
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 Title

Proposed Amendment No. 2

Contract No. 2202790/SCN-0000382

Water Resource Recovery Facility (WRRF) Improvements to the Sludge Feed System for Solids Processing Engineering Services

CIP #213006/BCE Score: 76.60

Body                     

Agenda of:                     March 11, 2026

Item No.:                     2026-081

Amount:                     Original Contract                                                               $4,346,982.00

                                          Amendment No. 1                                                                         200,000.00

                                          Proposed Amendment No. 2                       1,244,955.00

                                          Total Contract Amount                                $5,791,937.00

 

TO:                     The Honorable

                     Board of Directors

                     Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                     Chief Executive Officer

                     Great Lakes Water Authority

 

DATE:                     February 27, 2026

 

RE:                     Proposed Amendment No. 2

                     Contract No.  2202790/SCN-0000382

                     Water Resource Recovery Facility (WRRF) Improvements to the Sludge Feed System for Solids Processing Engineering Services

                     Vendor: CDM Smith Michigan, Inc.

                     Status: Amendment/Change Order

 

MOTION

Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 2202790/SCN-000382, Proposed Amendment No. 2,  “Water Resource Recovery Facility (WRRF) Improvements to the Sludge Feed System for Solids Processing Engineering Services” with CDM Smith Michigan, Inc., for an increased cost of $1,244,955.00 for a total cost not to exceed $5,791,937.00 and an increased duration of 1,220 days for a total duration of 2,475 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

GLWA awarded Contract No. 2202790 “WRRF Improvements to the Sludge Feed System for Solids Processing Engineering Services” to CDM Smith Michigan, Inc. (Engineer). The Contract is an Engineering Design Services Agreement for improvements to the Sludge Feed System, including replacing aged and oversized components, incorporating sludge feed loops into the conveyance systems, and providing improvements to the Sludge Storage Tank Pipe Gallery.

JUSTIFICATION

The original contract included provisions for the Engineer to provide services through a 22-month construction period. The actual construction contract as-bid duration for the project is approximately 39 months. Additionally, the original contract required only weekly inspections from the Engineer. GLWA requires full-time resident project representative (RPR) services throughout the construction duration.  This change extends the contract duration to reflect the project construction start date and duration, provides additional funding to cover the additional construction duration, and adds the RPR services to the construction phase of the work.      

PROJECT MANAGEMENT STATUS

Original Contract Time                                            1,255 days (04/14/2023 - 09/20/2026)

Amendment No. 1                                                                        0 days

Proposed Amendment No. 2                      1,220 days (09/21/2026 - 01/22/2030)

New Contract Time                                                                 2,475 days (04/14/2023 - 01/22/2030)

 

PROJECT ESTIMATE

Original Contract Price                                           $4,346,982.00

Amendment No. 1                                                                     200,000.00

Proposed Amendment No. 2                       1,244,955.00

New Contract Total                                                                $5,791,937.00

 

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.              

Funding Source: 5421 - Wastewater Construction Fund

Cost Center: 880000 - Capital Improvement Program

Spend Category: Construction

Project Worktag: PRJ-213006

Estimated Cost by Year and Related Estimating Variance: See table below.

 

Original Contract Price                                                              $4,346,982.00

Amendment No. 1                                                                                                                          200,000.00

Proposed Amendment No. 2                                                                                                 1,244,955.00

 

New Contract Total                                                                         $5,791,937.00

Amended Financial Plan Estimate                                          $16,000,000.00

Balance reserved for construction:                                          $10,208,063.00

 

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on March 11, 2026.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.