File #: 2026-029    Version: 1 Name:
Type: Resolution Status: New Business
File created: 1/30/2026 In control: Board of Directors
On agenda: 2/25/2026 Final action:
Title: Proposed Amendment No. 3 Contract No. 1900455-1/SCN-0000287 Architectural, Engineering, and Design Services O&M
Sponsors: Cheryl Porter
Indexes: Water Operations

Title

Proposed Amendment No. 3

Contract No. 1900455-1/SCN-0000287

Architectural, Engineering, and Design Services

O&M

Body

Agenda of:                     February 25, 2026

Item No.:                     2026-029

Amount:                     Original Contract                                                               $400,000.00

                                          Amendment No. 1                                                                            0.00

                                          Amendment No. 2                                                                            0.00

                                          Proposed Amendment No. 3                                  0.00

                                          Total Contract Amount                                          $400,000.00

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     January 30, 2026

 

RE:                                          Proposed Amendment No. 3

                                          Contract No. 1900455-1/SCN-0000287

                                          Architectural, Engineering, and Design Services

                                          Vendor: SDG Associates, LLC

                                          Status: Amendment/Change Order

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 1900455-1/SCN-0000287, Proposed Amendment No. 3, “Architectural, Engineering, and Design Services” with SDG Associates, LLC, with no increase in cost for a total cost not to exceed $400,000.00, and an increased duration of 842 days for a total duration of 2,669 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

 

BACKGROUND

GLWA has multiple facilities that require architectural, engineering design services, including but not limited to: GLWA office facilities, the five (5) water treatment plants, treated water booster pumping stations, wastewater pumping stations, wastewater CSOs, and water resource recovery facilities. The services contract provides architectural and engineering design and documentation assistance for planned improvements and/or repairs to GLWA Facilities. The documentation produced is used for planning, soliciting bids, estimating and construction services.

SDG Associates, LLC, Contract No. 1900455-1 has been working with GLWA Facilities and the Northeast Water Plant Lab team on engineering and documentation of much needed improvements to the existing water lab at the plant and repairs to the Imlay Booster Station retaining wall. The engineering and documentation are being completed, and we are progressing toward the procurement process of bidding, award, and the construction process. SDG Associates, LLC are needed to continue to provide services during bidding and construction.

JUSTIFICATION

The existing five-year Contract No. 1900455-1 will expire March 12, 2026, and this 27-month, 19-day contract extension will allow GLWA to maintain its current Architectural and Engineering Services team (SDG) through the completion of the Northeast Water Treatment Plant Water Lab Improvements and the Imlay Booster Station Retaining Wall Repairs project. Bidding for both projects is to occur in January 2026. Award and Construction are anticipated to occur following the award of the contracts.  This contract extension request is time only, with an end date of July 1, 2028.

PROJECT MANAGEMENT STATUS

Original Contract Time                                              731 days                     (03/12/2021 - 03/12/2023)

Amendment No. 1                                                          731 days                     (03/13/2023 - 03/12/2025)

Amendment No. 2                                                                  365 days                     (03/13/2025 - 03/12/2026)

Proposed Amendment No. 3                         842 days                     (03/13/2026 - 07/01/2028)

New Contract Time                                                                2,669 days                     (03/12/2021 - 07/01/2028)

 

 

 

PROJECT ESTIMATE

Original Contract Price                                           $400,000.00

Amendment No. 1                                                                            0.00

Amendment No. 2                                                                             0.00

Proposed Amendment No. 3                                  0.00

New Contract Total                                                                $400,000.00

FINANCIAL PLAN IMPACT

This proposed amendment with SDG Associates, LLC is for an extension of time only. This purchase order is on an as-needed basis where the use of this service may vary by year. There is no budget in our financial plan for this purchase order. Should this purchase order be used, we would offset its spend from potential positive variances of other contractual services from Facility Operations.  The remaining variance will be funded from Reserves.

Funding Source: Operations & Maintenance (O&M) Budget

Cost Center: Facility Operations 882421

Expense Type: Contractual Operating Services (SPE000067)

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on February 11, 2026. The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.