File #: 2021-165    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/30/2021 In control: Board of Directors
On agenda: 5/26/2021 Final action: 5/26/2021
Title: Contract No. 2004082 Rehabilitation of Woodward Sewer System CIP# 260207
Sponsors: Cheryl Porter, Todd King
Indexes: Water Operations
Attachments: 1. 2004082 Procurement Board Report, 2. 2004082 Cost Tabulation, 3. 2004082 - Lanzo Construction Memo v2

Title

Contract No. 2004082

Rehabilitation of Woodward Sewer System

CIP# 260207

Body

Agenda of:                     May 26, 2021

Item No.:                     2021-165

Amount:                     $18,695,250.00

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Sue F. McCormick

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     May 4, 2021

 

RE:                                          Contract No. 2004082

                                          Rehabilitation of Woodward Sewer System

                                          Vendor:  Lanzo Construction Co., Florida

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Contract No. 2004082 “Rehabilitation of Woodward Sewer System ” with Lanzo Construction Co., Florida, at a cost not to exceed $18,695,250.00 for a duration of 18 months; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

GLWA’s Sewer Conveyance System has approximately 130 miles of trunk sewers and 51 miles of interceptors.  The Woodward Sewer System (WWSS) is an important trunk sewer located in GLWA’s Central Sewer District and consists of five main segments totaling approximately 8 miles in length. WWSS, one of the oldest sewers in the City of Detroit (circa pre-1900), is generally of brick construction, and consists of various sizes and shapes.  The WWSS is aligned with Woodward Avenue in Highland Park (WW-100’s) and Detroit (WS-100’s and WS-200’s), Michigan, from McNichols Road at the upstream end to the Detroit River Interceptor in downtown Detroit, flowing generally north to south. The WS-300’s segment services an area east of Woodward Avenue and connects to the Woodward Sewer at Woodward Avenue and Chandler Street. The Woodward Extension sewer segment that serves an area west of Woodward Avenue in Highland Park is also a part of the WWSS.

JUSTIFICATION

Pipeline Assessment and Certification Program (PACP) inspections for the WWSS consisting of Closed-Circuit Television (CCTV) were performed in 2017 and man-entry inspections were performed in 2019. The inspections identified leaks, defective taps, settled deposits, cracks, root intrusions, structural defects, and other defects that require repair to the sewers.  These rehabilitation repairs are necessary to prevent structural failure of the trunk sewer, prevent further deterioration of the important trunk sewer, and extend the useful life of an important linear infrastructure asset. Chemical grouting repairs will be used to address most of the identified defects. A portion of the alignment will be slip-lined due to the need for more extensive structural rehabilitation. Heavy cleaning will remove settled sand, gravel, mud, and organic matter filling 20% to 30% of the pipe cross section in some locations.

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.              

Funding Source: Wastewater Construction Fund

Cost Center: Wastewater Field Engineering

Expense Type: Construction (5421-892411.000-616900-260207)

Estimated Cost by Year and Related Estimating Variance:  See table below.

Fiscal Year

FY 2021 Plan                                                                                                          $  3,138,000.00

FY 2022 Plan                                                                                                                           0.00

FY 2023 Plan                                                                                                             7,214,000.00

FY 2024 Plan                                                                                                             7,915,000.00

FY 2025 Plan                                                                                                           10,695,000.00

FY 2026 Plan                                                                                                           11,547,000.00

Financial Plan Estimate                                                                                    $40,509,000.00

Proposed Contract Award                                                                                      18,695,250.00

Estimating Variance                                                                                                         $21,813,750.00

This proposed contract is being funded from unallocated Program No. 260200 balances identified in FY 2022 - 2026 approved CIP.                     

SAVINGS, COST OPTIMIZATION, AND REVENUE ENHANCEMENT IMPACT

The cost savings are not determinable at the time of award.

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on May 12, 2021.  The Operations and Resources Committee unanimously recommended that the GLWA Board adopt the resolution as presented, subject to receiving additional information regarding the proposed Florida based vendor’s plan to perform the work in Michigan.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.