Legislation Details

File #: 2026-353    Version: 1 Name:
Type: Resolution Status: New Business
File created: 8/27/2026 In control: Operations and Resources Committee
On agenda: 9/9/2026 Final action:
Title: Requisition No. REQ-0006631 Newburgh Road Booster Pumping Station Improvements CIP #132015 / BCE Score: 58.90
Sponsors: Cheryl Porter
Indexes: Water Operations
Attachments: 1. REQ-0006631 Procurement Board Report, 2. REQ-0006631 Cost Tabulation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Requisition No. REQ-0006631

Newburgh Road Booster Pumping Station Improvements

CIP #132015 / BCE Score: 58.90

Body

Agenda of:                     September 23, 2026

Item No.:                     2026-353

Amount:                     $60,950,180.00

 

TO:                                          The Honorable

                                          Board of Directors

                                          Great Lakes Water Authority

 

FROM:                     Suzanne R. Coffey, P.E.

                                          Chief Executive Officer

                                          Great Lakes Water Authority

 

DATE:                     August 28, 2026

 

RE:                                          Requisition No. REQ-0006631

                                          Newburgh Road Booster Pumping Station Improvements

                                          Vendor: Walsh Construction Company

                                          Status: New Contract/PO

 

 

MOTION

Upon recommendation of Cheryl Porter, Chief Operating Officer - Water and Field Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Chief Executive Officer (CEO) to enter into Requisition No. REQ-0006631, “Newburgh Road Booster Pumping Station Improvements” with Walsh Construction Company, at a cost not to exceed $60,950,180.00 for a duration of 1,300 days; and authorizes the CEO to take such other action as may be necessary to accomplish the intent of this vote. 

BACKGROUND

The Newburgh Road Booster Pumping Station, located  in Livonia, Michigan, boosts water pressure through a 42-inch transmission main to serve the member communities of the City of Farmington Hills, City of Livonia, City of Novi, City of Northville, and Northville Township. The existing process mechanical (including pumping units), building mechanical, electrical distribution, and electrical switchgear equipment are original to the station as constructed in the mid-1960s. Water system demand trends in the Newburgh Station service area will exceed the capacity of the existing station. Additionally, with the completion of the 14 Mile Road Transmission Main Loop Project (CIP No. 122013), the Newburgh Station plays a critical role in providing redundancy to the Haggerty Station service area demands. This project replaces the existing Newburgh Station on the south side with a new station located in Farmington Hills, Michigan, directly across from the existing station. Included in the scope of work is construction of a new station having the dual purpose of meeting the changing demands of the service area and improved redundancies in the northwest portion of the GLWA service area. Also, this CIP funded project includes demolition of the existing pumping station and repurposing the site to a storage facility used by GLWA operations in the northwest portion of the service area.

JUSTIFICATION

Rehabilitation is not a sufficient approach to address the station’s needs and to provide necessary firm capacity to continue to meet the system demands of its service area. Construction of a new pumping station with sufficient capacity and site area will allow GLWA to meet service area demands, reduce the long-term operations and maintenance costs associated with servicing older equipment, and increase redundancy in the northwest portion of the GLWA service area. Additional benefits that the new pumping station will offer include but are not limited to:

 

                     Flow control, operational flexibility, redundancy, and resiliency (improved surge protection)

                     Flow capacity (minimum and maximum), number of pumps, and future needs

                     Standby power generator

 

FINANCIAL PLAN IMPACT

Summary: Sufficient funds are provided in the financial plan for this project.

Funding Source: 5519 - Water Construction Fund

Cost Center: 880000 - Capital Improvement Program

Spend Category: Construction

Project Worktag: PRJ-132015

Estimated Cost by Year and Related Estimating Variance:

Fiscal Year

FY27                                                                                                                                                   $15,626,000.00

FY28                                                                                                                                                     29,025,000.00

FY29                                                                                                                                                     22,359,000.00

FY30                                                                                                                                                       2,990,000.00

Financial Plan Estimate                                                                                    $70,000,000.00

Proposed Contract Award                                                                                    $60,950,180.00

Estimating Variance                                                                                                         $  9,049,820.00

COMMITTEE REVIEW

This item was presented to the Operations and Resources Committee at its meeting on September 9, 2026.

SHARED SERVICES IMPACT

This item does not impact the shared services agreement between GLWA and DWSD.