Great Lakes Water Authority Logo
File #: 2022-200    Version: 1 Name:
Type: Resolution Status: Passed
File created: 5/23/2022 In control: Board of Directors
On agenda: 6/22/2022 Final action: 6/22/2022
Title: Proposed Change Order No. 3 Contract No. GLWA-CS-060 Study/Design of an Upgraded Sludge Conveyance System and Lighting Improvements at the Detroit Wastewater Treatment Plant Vendor: Black & Veatch Limited of Michigan
Sponsors: Navid Mehram
Indexes: Wastewater Operations

Title
Proposed Change Order No. 3
Contract No. GLWA-CS-060
Study/Design of an Upgraded Sludge Conveyance System and
Lighting Improvements at the Detroit Wastewater Treatment Plant
Vendor: Black & Veatch Limited of Michigan

Body
Agenda of: June 22, 2022
Item No.: 2022-200
Amount: Original Contract Price $ 1,990,000.00
Change Order No. 1 96,404.00
Change Order No. 2 0.00
Proposed Change Order No. 3 0.00
New Contract Total $ 2,086,404.00

TO: The Honorable
Board of Directors
Great Lakes Water Authority

FROM: Suzanne R. Coffey, P.E.
Interim Chief Executive Officer
Great Lakes Water Authority

DATE: May 27, 2022

RE: Proposed Change Order No. 3
Contract No. GLWA-CS-060
Study/Design of an Upgraded Sludge Conveyance System and Lighting Improvements at the Detroit Wastewater Treatment Plant
Vendor: Black & Veatch Limited of Michigan

MOTION
Upon recommendation of Navid Mehram, Chief Operating Officer - Wastewater Operating Services, the Board of Directors (Board) of the Great Lakes Water Authority (GLWA), authorizes the Interim Chief Executive Officer (ICEO) to enter into Contract No. GLWA-CS-060, Proposed Change Order No. 3, "Study/Design of an Upgraded Sludge Conveyance System and Lighting Improvements at the Detroit Wastewater Treatment Plant" with Black & Veatch Limited of Michigan, with no increase in cost, for a total cost not to exceed $2,086,404.00 and an increased duration of 365 days for a total contract duration of 2,619 days; and authorizes the ICEO to take such other action as may be necessary to accomplish the intent of this vote.

BACKGROUND
Black & Veatch Limited of Michigan was awarded the original contract with a start work date of April 29, 2016, for a total contract amount of not-to-exceed $1,990,000.00 for a duration of 914 days. The main objective of the Black & Veatch consultant services contract was to restore sludge conveyance capacity lost due to the March 2016 fire damage while ...

Click here for full text